Huana Warehouse Project
This project is designed to store and keep food, vegetables, and fruits; the project is composed of some refrigerator stores and some normal stores.
Project Information
- Owner: Top Cars Company
- Location: Sulaymaniyah / Iraq
- Type: Commercial Building
- Status: Completed
Products provided for the power station:
- 1250A, 25kA/1s, 12 kV switchgear
- 2000kVA, 0.416/33kV step-down transformers
- MV, LV & Control cables
- Remote control panel
- AC distribution System & DC Panel system
- Earthing and substation building lightning protection system items.
Products provided for the Site and buildings:
- LV panels
- kiosk transformers
- Underground cables
- MV, LV & Control cables
- Earthing, and substation building protection system items.
Work has been done for this project:
- Design
- Supply
- Installation
- Operation
- Test
- Commissioning



FECTUM